Stories from the production floor.
Bodhee Production Scheduler
Bodhee Production Scheduler generates feasible, executable schedules from your master data, ERP feeds, and shop-floor constraints — and reschedules in real time as conditions change.
Pick your scheduler.
Three Bodhee modules, one live schedule. Each has its own playbook, reference deployments, and ROI math.
11 resources for you.
Filter by content type or industry. Everything is written by engineers and customer-success leads who ship into real plants.
Bodhee Production Scheduler
Bodhee Production Scheduler generates feasible, executable schedules from your master data, ERP feeds, and shop-floor constraints — and reschedules in real time as conditions change.

The silo tax — a manufacturing-economics argument for cross-functional scheduling
Production plans the line. QC plans the lab. Maintenance plans the equipment. Each plan is rational. The collision between them costs capacity that nobody invoices, nobody books, and nobody owns. That cost has a name.
Neewee's Value-Based Collaborative Company Culture
Co-founder and CEO Harsimrat Bhasin walks through the three values that define how Neewee works — empathy for the customer, the best-idea-wins ethos, and full transparency.
Neewee's Tree of Wisdom
A short film about the Tree of Wisdom — a symbol Neewee built to honour the alumni and current 'NeeBees' who shaped the company's growth journey.
Neewee Culture
A short look inside Neewee — the people, the values, and the way we work to ship Adaptive Scheduling solutions for manufacturing on time, every time.
Meet Bodhee — Integrated, Simple, Shop-Floor-Delivered Scheduling Solutions
An overview of Bodhee — a Manufacturing Scheduling solution powered by a Process Digital Twin that pulls data from ERP, MES, SCADA, and OT systems to deliver shop-floor-ready actions across yield, quality, productivity, and cycle time.

Master data drift — the quiet killer of every scheduling rollout
The day you go live is the day your scheduling model starts decaying. Routings move, BOMs change, equipment swaps in. Nobody tells the planner. Six months later the schedule looks fine and runs nothing like the plant.

The 30% Problem
Cleaning, changeover, validation, and QC hold consume roughly a third of staffed time. Most schedulers treat them as fixed buffers — or don't model them at all. Here's what it costs.

Your schedule is already wrong by 9 a.m.
A static production schedule stops being a plan the moment reality starts moving. Two hours in, you're inside the variance the plan didn't allow for. The fix isn't a faster rebuild — it's a different architecture.
Handling demand spikes: dynamic scheduling for seasonal production swings
Seasonal demand isn't a forecasting problem. It's a feasibility problem. The campaign mix you can run in November is not the campaign mix you can run in March, and the schedule has to know that.
Productivity recovered across multiple APUs at a large-scale European API plant
How a leading European Active Pharmaceutical Ingredient provider replaced annual sales-projection plans with event-driven, AI-generated schedules across its autonomous production units — measurable productivity gains within 8–12 weeks of go-live.
Deep in your domain.
We do not over-explain manufacturing to manufacturers. Each industry hub lists deployments, regulatory fit, and the constraints we have seen most often.
Pharmaceuticals
Sterile, biotech, CDMO. Audit-trail ready.
- 12 live deployments
- EU GMP Annex 11
- 21 CFR Part 11
Specialty Chemicals
Campaign-driven, changeover-heavy.
- 8 live deployments
- Intermediates + agrochemicals
- Multi-site reconciliation
Process Manufacturing
Continuous and batch. 1,800+ SKUs.
- 3 live deployments
- Food, paper, metals
- Sensor-aware scheduling